Check out the traffic and travel updates for current and forthcoming road closures and roadworks in Cambridgeshire over the coming days and weeks.
Delays
Between Milton and Chittering due to works taking place under temporary multi-way signals today until March 27 between 9.30am and 3.30pm daily.
Rectory Road - Duxford
The road is closed both ways to all motor vehicles today between the hours of 9.30am and 3.30pm due to works by We Are Openreach
Toseland Road to A248 Cambridge Road
The road will be closed from 7am on March 23 to 5am on March 25 for works by National Highways.
Hauxton Road/High Street - Little Shelford
Road approaching the level crossing will be closed to all traffic on March 26 between the hours of 12.01am and 4am due to works by Network Rail.
A1101 Bates Drove - Littleport
Closed both ways to all traffic between March 25 and May 31 for works.
Church Street - Whittlesey
B1040 between London Street and Briggate Way closed both ways to all traffic until March 28 due to works by UK Power Networks.
High Road - Gorefield
Two-way signals in place until March 28 due to emergency works by Anglian Water to repair a leaking main.
Lynn Road - Wisbech
Closed at its junction with Townshend Road until March 27 due to emergency works by Anglian Water.
Planned rail engineering works:
Buses will replace trains on March 29 and 30 March between: Cambridge North and Ely, Cambridge and Bury St Edmunds via Newmarket.
Buses will replace trains on March 31 between: Cambridge North and Ely, Norwich and Cambridge North, Bury St Edmunds and Peterborough via Ely.
On April 1, buses will replace trains between: Ely and Cambridge North.
Hinton Way - Great Shelford
The road will be closed both ways to all motor vehicles until June 7 due to works by Cadent Gas.
Swaffham Heath Road - Dullingham
The road will be closed both ways to all motor vehicles until June 12 for works.
Rail Engineering Work - Midland Main Line
On March 23-24, engineers will be laying new track to deliver smoother journeys between Syston and Helpston which will affect Cross Country services from Leicester to Peterborough. A rail replacement bus will be in place to serve passengers along this route.
Little Green - Cheveley
The road will be closed both ways to all motor vehicles until March 22 due to works by Open Reach.
Fenstanton Busway
The South Section of the Busway will be closed in both directions for the erection of a permanent fence until March 29.
A505 Royston Road - Duxford
The road will be closed both ways to all motor vehicles until April 27 between the hours of 9pm and 5am nightly for works.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here