Check the latest traffic and travel updates for road closures, roadworks and possible delays across Cambridgeshire today (November 10) and in the weeks ahead.
Addenbrooke's Road/A1301 Shelford Road - Cambridge
Delays due to temporary traffic lights. Advice is to avoid area if you can.
APV Baker Footbridge - Peterborough
Repairs to the footbridge begin on November 13. There will be a single lane closure, from 9.30am till 3.30pm, southbound on the A15 Paston Parkway during some of the works with 40mph in place. Project runs until the Spring.
Brampton Road - Cambridge
The road is closed both ways to all motor vehicles until November 10 due to works by Cambridge Water.
Kings Ripton Road - Sapley
This road is currently closed until November 10 for emergency works by Anglian Water.
Grantchester Street - Cambridge
This road is currently closed until November 10 for emergency works by Cambridge Water.
B1102 Mildenhall Road – Fordham (between Isleham Road and Hares Run)
Closed until November 10 for works.
Muchwood Lane - Ramsey
The road will be closed both ways to all motor vehicles between November 9-13 from 7am to 5pm daily for carriageway works.
Earl Street and Orchard Street - Cambridge
The road is closed both ways to all motor vehicles until November 11 between 9:30am and 3:30pm daily due to works by City Fibre.
Yarrow Road and Fulbourn Old Drift - Teversham
The road is closed both ways to all motor vehicles until November 13 due to works by the Electricity Network Company.
Upton Hill - Upton
The road will be closed both ways to all motor vehicles until November 13.
Popple Drove - Gorfield
The road will be closed both ways to all motor vehicles on November 13 between 9.30am and 3.30pm due to works by Open Reach.
Beck Road - Isleham
This road will be closed both ways to all motor vehicles between November 13-19 due to works by Anglian Water.
Eagles Lane - Little Downham
Closed both ways to all traffic until December 1 for works.
A1134 - Milton Road, Cambridge
Between Victoria Road and Westbrook Drive will be closed to all motor vehicles on weekends between November 11 and December 3 due to works by Cambridge Water.
A10 Milton Bypass - Milton (between Milton roundabout and Butt Lane)
The road is closed both ways to all motor vehicles overnight until December 9 between 9pm and 5am nightly for carriageway works. (No works on November 17).
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here